Renovating a space that has to stay open.

Commercial and hospitality projects carry a constraint homes rarely do: the business keeps running. Hotels, restaurants, shops and offices need a plan that protects guests and revenue while the work happens.

Request an estimate

A renovated coastal hotel lobby with stone floors, warm wood and tall windows facing the sea

What it costs

Interior renovation, per square foot.

For a commercial interior renovation at a premium finish, our planning model gives roughly $202–$567 per square foot in Rancho Palos Verdes and $213–$596 in Palos Verdes Estates, close to Santa Monica and above Long Beach. Restaurants sit at the top of any range because of kitchens, exhaust and grease systems; offices and simple retail sit lower.

Chart: estimated commercial interior renovation cost per square foot. Palos Verdes Estates $213–$596, Rancho Palos Verdes $202–$567, Santa Monica $207–$580, Long Beach $168–$470.
  1. Rancho Palos Verdes$202–$567 per sq ft
  2. Palos Verdes Estates$213–$596 per sq ft
  3. RestaurantsKitchens and exhaust push costs up
  4. Offices and retailUsually the lower part of the range

By type

Three kinds of project, three plans.

The constraints differ by use, and so does the order of work.

  1. Hotels

    Renovate in phases (a floor or wing at a time) so rooms stay sellable, with quiet hours and protected guest routes. Plan guest-room cycles: soft furnishings refresh more often than bathrooms and case goods.

  2. Restaurants

    Health department review, kitchen ventilation and grease handling drive the schedule. Order equipment early and plan the opening date around inspections.

  3. Retail and offices

    Work after hours or behind a clean partition, and coordinate with the landlord's requirements for tenant improvements.

Code and access

Alterations bring accessibility with them.

In California, altering a commercial space usually means improving the accessible route to it as well: entrances, restrooms, parking and signage. Fire, life-safety and energy upgrades can be triggered too. Knowing which apply before design avoids a redesign during plan check.

A renovated restaurant dining room with timber ceilings and a view of the ocean
  1. Accessible path of travel, restrooms and parking
  2. Fire and life-safety systems
  3. Energy code for lighting and mechanical work
  4. Health department review for food service

Common questions

Commercial questions

Can we stay open during the work?

Often, with phasing, after-hours work and clear separation between the work area and guests or customers. Some work, such as a restaurant kitchen, may need a short closure.

How firm are these figures?

Figures are planning ranges (2024 Southern California base rates, adjusted for each city and finish level). They are not a bid; a site visit and drawings set the real number.

Request an estimate

Tell us about the space.

Describe the property, the use and how long it can close, and we will come back with a phasing outline and cost bands.

What happens next

  1. You tell us about the project Your name, your email and a line about the work is enough to start.
  2. We reply within two business days With a realistic outline of scope, timing and cost ranges.
  3. We walk the property with you Then you decide. No obligation and no pressure before you commit.
Our office609 Deep Valley Dr, Suite 200
Rolling Hills Estates, CA 90274Google Maps ↗Apple Maps ↗
What is the project? (optional)
Add more detail (optional)

No obligation. Your details stay private. We never sell them.

Request an estimate